Publications / 2013 Proceedings of the 30th ISARC, Montréal, Canada

Performance Reporting Using Schedule Compression Index

Bahaa Hussein, Osama Moselhi
Pages 783-792 (2013 Proceedings of the 30th ISARC, Montréal, Canada, ISBN 978-1-62993-294-1, ISSN 2413-5844)
Abstract:

Considerable number of methods and procedures has been introduced for trending and progress reporting of engineering, procurement and construction projects. This paper introduces a novel method, designed to augment the set of indices for measuring schedule performance. The concept behind the developed method is to provide early warning by dynamically evaluating the schedule cumulative impact of construction projects. The proposed method is designed to highlight the gradual deterioration in schedule status resulting in a cumulative impact due to the aggregation of small delays encountered during the execution of non-critical activities, and can be used as an add-on utility to existing software systems that perform CPM scheduling. The proposed method is based on a developed formulation for quantification of the Schedule Compression Index, which takes into consideration the remaining project activities durations. The index is developed based on periodic comparisons of “Current Schedules” and the project “Baseline Schedule” using the summation of the remaining activities durations. A numerical example is presented to demonstrate the application and capabilities of the developed method. It is expected that the developed index together with other schedule performance indices would be of value to decision makers and members of project teams.

Keywords: Schedule Performance, Critical Path Method, Schedule Cumulative Impact, Progress Reporting